Skip to content

Production Guide

Running a Work Order

Section 3 / 3 / Version 1.0

A work order is the production instruction that records material consumption and output.

Steps

  1. From the work requirement, create a Work Order.
  2. Set start and end dates.
  3. Record actual material consumption and output (P+) as it happens.
  4. Book the transaction — materials decrease, finished goods increase.
  5. Record labor or machine costs where applicable.
The gap between BOM and actual consumption is your production cost insight. Record it honestly rather than forcing it to match.